South Palm Canyon Drive Low Water Crossing (Bridge) Project
Project Description: Bridge widening includes construction of a new bridge and drainage improvements at Arenas Canyon South drainage channel.
Location: South Palm Canyon Drive from Murray Canyon to Bogert Trail
Project Justification: Eliminate flooded roadway with a four-lane bridge on South Palm Canyon Drive
Estimated Cost: $9.9 million
Project Status: Complete the CEQA Addendum and NEPA coordination, including responses to wildlife‑agency comments.
For an overview, and information about the project's history, visit: https://engagepalmsprings.com/south-palm-canyon-drive-low-water-bridge-crossing-2
Share South Palm Canyon Drive Low Water Crossing (Bridge) Project on Facebook
Share South Palm Canyon Drive Low Water Crossing (Bridge) Project on X (formerly Twitter)
Share South Palm Canyon Drive Low Water Crossing (Bridge) Project on Linkedin
Email South Palm Canyon Drive Low Water Crossing (Bridge) Project link
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends