Ramon Road over the Whitewater Channel

Estimated Start of Construction: Late 2024 or Early 2025

Location: Ramon Road Bridge, 0.8 miles East of Gene Autry Trail.

Project Description: Widen 4-lane bridge to 6-lane bridge, seismic retrofit as necessary, scour countermeasures.

Project Justification: The existing street is six lanes on either side of the bridge. The four-lane bridge is a bottleneck. There is no pedestrian sidewalk on the north side of the bridge.

Estimated Cost: 48 million

Link to City Council Staff Report, June 13, 2024

Share Ramon Road over the Whitewater Channel on Facebook Share Ramon Road over the Whitewater Channel on Twitter Share Ramon Road over the Whitewater Channel on Linkedin Email Ramon Road over the Whitewater Channel link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>