Ramon Road over the Whitewater Channel

Location: Ramon Road Bridge, 0.8 miles East of Gene Autry Trail.

Project Description: Widen 4-lane bridge to 6-lane bridge, seismic retrofit as necessary, scour countermeasures.

Project Justification: The existing street is six lanes on either side of the bridge. The four-lane bridge is a bottleneck. There is no pedestrian sidewalk on the north side of the bridge.

Estimated Cost: 48 million

Project Status: In Design

Link to City Council Staff Report, June 13, 2024