Ramon Road over the Whitewater Channel
Estimated Start of Construction: Late 2024 or Early 2025
Location: Ramon Road Bridge, 0.8 miles East of Gene Autry Trail.
Project Description: Widen 4-lane bridge to 6-lane bridge, seismic retrofit as necessary, scour countermeasures.
Project Justification: The existing street is six lanes on either side of the bridge. The four-lane bridge is a bottleneck. There is no pedestrian sidewalk on the north side of the bridge.
Estimated Cost: 48 million
Share Ramon Road over the Whitewater Channel on Facebook